Short answer: the super BOM is the master BOM of a configurable material, every part any variant could use plus the rules that pick from it. An order BOM is a copy that belongs to one sales order item, made when engineering has to change that order by hand. Most teams miss a third case. Without an order BOM, SAP usually stores only the customer's characteristic values. It works out the component list again at every explosion, against the super BOM valid on that day. The configuration profile decides which of these you get.
Five things called "the BOM" on a configured order
Threads like"Diff between order bom and sales order bom"keep coming back because SAP uses similar names for different objects. Sorted by what is actually stored:
| Name | What is stored | Belongs to | When the parts are decided |
|---|---|---|---|
| Super BOM | All items, with selection conditions, procedures and class items | The configurable material (master data) | Never; it holds every possibility |
| Sales BOM (usage 5) | A separate BOM read by sales, or the sales-relevant items of a universal BOM | The material | At order entry, for items that become sub-items |
| Configured BOM | Not on the sales order: only the characteristic values. Each planned or production order keeps its own exploded copy | The sales order item's configuration | At each explosion: planned order, production order, re-explosion |
| Order BOM, result-oriented | The configured result plus manual edits | One sales order item | When engineering saves it |
| Order BOM, knowledge-based | A copy of the super BOM with its dependencies and manual edits | One sales order item | At explosion, from that copy |
The two order BOM types are defined in SAP'sProcess: Order BOMpage. CS61 creates an order BOM by copying and editing a material BOM. CU51 is the LO-VC transaction for configurable order BOMs, and under AVC SAP'sS/4HANA trainingpoints to the Order Engineering Worklist and Manage Order Bill of Material apps instead. The general idea of a configurable BOM is covered in What is a 150% BOM?, so this page stays with SAP.
Where the list gets decided, by profile scenario
The processing type in the configuration profile is the switch. SAP'sprofile traininglists the combinations. Under LO-VC you can have no explosion, single-level or multilevel. Under AVC there is no single-level option. What each one means for the build:
- Planned/production order. The order carries the header material and the values. Per SAP'smultilevel explosion page, components and operations are determined in the planned or production order from the assigned values. By default MRP explodes as of the planned order's start date. A BOM explosion number pins one key date across all levels, as discussed in thisSAP Community thread on explosion dates. So the list is decided weeks after the sale, against whatever master data is valid then.
- Sales order (SET). Sales-relevant items become sub-items at order entry and can be priced and delivered as their own lines. Everything not sales-relevant is still decided at production.
- Order BOM. Sales captures values, then engineering processes the BOM per order. Result-oriented freezes the list when saved, and later configuration changes do not change it. Theusual fix people reportis to delete it with CS62 and recreate it in CU51. Knowledge-based keeps the rules, so it follows configuration changes, but it is re-evaluated at explosion. Under LO-VC the BOM is not exploded in the sales order at all unless "maintenance in order allowed" is set. Order BOMs only drive MRP if the sales order BOM indicator is set in explosion control (OPPQ).
"Configured BOM could not be exploded": find the layer first
The same complaint comes from four places, and the fix depends on which one. Start from where the symptom shows up:
| Where it shows | Typical cause | First check |
|---|---|---|
| SAP CPQ quote shows prices but no BOM items | Knowledge base replicated without BOM items. In this 2024 case it had been generated for the wrong plant | KB payload in CPQ: does the root product have bomItems? Are the sub-items sales-relevant in the ERP? |
| Sales order shows no components | Working as designed: LO-VC order BOM scenario, or items not sales-relevant | Profile processing type and explosion level |
| MRP or planned order: message 61258 or 61259 | No configuration data reached the requirement: requirement class, mixed MTS/MTO strategy, batch split, manual subcontracting schedule line (thread) | Requirement class uses single-item planning with configuration; SAP Note 73226 |
| Planned order ignores an order BOM | The order BOM is attached to sub-item 20, the planned order to item 10 (thread) | Which item the requirement and the order BOM each point to |
One common assumption is wrong for SAP's own stack. For VC products, SAP CPQ doesn't re-implement the object dependencies. It calls SAP's Variant Configuration and Pricing service with the knowledge base replicated from the ERP. When the quote and the ERP disagree there, look at KB versions, plant and sales relevance before suspecting the rules. Rules really are written twice when the CPQ is not SAP's. Then every new option needs an edit in both, the drift covered in CPQ BOM reconciliation.
A worked example: the order that changed after it was sold
This example is invented; it is not a customer record. A window plant sells configurable material CW-440 under a planned/production order profile with multilevel explosion. The quote goes out on 14 September and sales order 4471 is entered on 15 September: triple glazing, 1100 mm wide, 24 V motor, left hinge. The super BOM selects a heavy-duty hinge for triple glazing (selection condition revision 2). The motor is a class item resolved by voltage. Two things happen before production. On 2 October, ECO-0519 changes the hinge condition to "triple glazing and width over 1200 mm". On 9 October purchasing classifies a new motor, MOT-24B, into the operator class and removes the old MOT-24 from it. The production order is created with a start date of 20 October.
| Item | Quote (14 Sep) | Sales order (15 Sep) | Production order (exploded 20 Oct) | Invoice |
|---|---|---|---|---|
| Glazing | Triple, priced | Value: triple | Triple IGU | Billed |
| Hinge | Not shown | Not stored | Standard hinge (rule rev 3) | Not shown |
| Motor | "24 V motor", priced | Value: 24 V | MOT-24B | "24 V motor" |
| Weatherseal | Not shown | Not stored | Length from width by procedure, unchanged | Not shown |
Nothing errors. The sales order still shows exactly what was sold. The build changed twice, and only one change has an ECO behind it. The motor swap shows up in no BOM change history, because adding and removing a classified material changes nobody's BOM. That is the convenience of class items, and it is also why it goes unseen. Whether the standard hinge is right for a 1100 mm triple unit sold under the old rule is a real question. Nobody decided it, because nothing compared the explosion with the sale.
The fix in SAP is to choose a freeze point on purpose: a BOM explosion number set from the sales order date, an order BOM, or a documented policy that builds follow current engineering. In SingleBOM's format the same order is one record. The configuration, the freeze rule and each view sit side by side, and every view records when and against which rule it was resolved:
{
"id": "order.SO-4471.item-10",
"configuration": {
"graph": "bom.win.cw-440", "captured": "2026-09-15",
"values": { "glazing": "triple", "width_mm": 1100, "operator": "motor-24v", "hinge_side": "L" }
},
"freeze": { "policy": "sales-order-date", "key_date": "2026-09-15" },
"views": {
"quote": { "lines": ["CW-440", "GLZ-TRI", "OPR-MOT"], "resolved_at": "2026-09-14" },
"build": { "resolved_at": "2026-10-20", "edges": [
{ "to": "HNG-STD", "qty": 2, "uom": "ea", "rule": "sel.hinge_std@rev3" },
{ "to": "MOT-24B", "qty": 1, "uom": "ea", "rule": "class.OPERATOR_24V" }
] },
"invoice": { "lines": ["CW-440", "GLZ-TRI", "OPR-MOT"], "from": "sales-order" }
},
"drift": [
{ "item": "hinge", "sold_rule": "sel.hinge_hd@rev2", "built_rule": "sel.hinge_std@rev3", "why": "ECO-0519, valid from 2026-10-02" },
{ "item": "motor", "sold": "MOT-24", "built": "MOT-24B", "why": "class item; no BOM change number" }
]
}Choosing the freeze point
- Build to current engineering (planned/production order, no fixed date) if changes are safety or compliance driven, order-to-build time is short, and customers buy a function, not a part list.
- Pin the date (BOM explosion number from the sales order) if what you quoted and certified must be what you build, but nobody needs to edit orders by hand.
- Result-oriented order BOM if engineering touches most orders and the build must not move once approved. The cost: later configuration changes need the order BOM rebuilt.
- Knowledge-based order BOM if configurations still change after engineering. The cost: master data changes keep flowing in until production.
Checks for a VC order flow
- Write down, per configurable material, which profile scenario and explosion level it uses, and why.
- For one recent order, compare the production order's components with an explosion as of the sales order date. Every difference is a decision someone should have made.
- List class items, and who is allowed to classify or declassify materials in their classes.
- Check whether selection conditions and procedures are changed under change numbers with valid-from dates, or edited directly.
- Confirm OPPQ has the sales order BOM indicator set wherever order BOMs are used.
- For each order BOM, confirm it hangs on the same sales order item that carries the requirement.
- If SAP CPQ quotes VC products, compare the KB version and plant in CPQ with the ERP after each KB release.
- Make the invoice trace back to the configuration it billed, not just to the header material.
Where SingleBOM fits, and where it doesn't
If one S/4HANA system holds the knowledge base, SAP CPQ quotes from it, and billing runs from SD, you don't need another layer. Pick a freeze point, run the checks, and use SAP's own tools. SingleBOM is for the cases where the configured product also lives outside SAP: a non-SAP CPQ with its own rules, a second ERP or a contract manufacturer building the same product, or billing that never sees the configuration. There the record above, quote, build, work order and invoice as views of one graph JSON, gives everyone one thing to diff. It is a draft format with no SAP connector. It doesn't execute object dependencies or replace VC, and nothing is hosted today, so in practice it is a file you generate and compare.
Related: EBOM vs MBOM for where the super BOM sits between engineering and the plant, Sales BOM vs production BOMfor the usage 5 versus usage 1 split, ECOs across CPQ, PLM and ERPfor testing open orders against a change, and Oracle CPQ BOM mappingfor the same resolution-date problem on Oracle's side.