Short answer: a multi-level BOM is a product whose components include assemblies with their own BOMs. Store it as links, each one a parent, a child, and a quantity per parent. Then print it whichever way the reader needs: indented for engineering, summarized for costing, netted level by level for purchasing. Problems start when one of those printouts is saved and edited as if it were the BOM.

The level 0, 1, 2 definitions and the Excel templates are well covered elsewhere. This piece covers what they leave out. A shared subassembly prints more than once. A part's level depends on the path you took to reach it. A summarized BOM overbuys when subassemblies are in stock. And the quote, the work order, and the invoice each read a different level of the same structure.

The indented list is a tree printed from a graph

Most ERPs store single-level BOMs: one parent, its direct children, a quantity per parent. The multi-level BOM is what you get by following those links down. Because a subassembly can sit under several parents, the links form a graph, not a tree. An indented report has to print a tree, so it repeats a shared subassembly, with all its contents, once for every path that reaches it.

That is fine on screen. It becomes a problem when the printout goes into a spreadsheet and comes back. MRPeasy's instructions for importing an indented SOLIDWORKS BOM spell it out:duplicate subassemblies must be removed by hand, or the subassembly's BOM is corrupted on import. Each repeated block was a separate copy, and nothing stopped someone from editing one copy and not the other.

Levels behave the same way. A level is not a property of a part. It is the depth of one path through the structure. The same screw can sit at level 2 under the frame and at level 3 under a kit inside the sash. ERPs deal with this with a low-level code, the deepest level at which the item appears in any BOM. SAP's training describes it as thelowest explosion level at which a material occurs in all the product structures. The planning run thenplans code 0 first, then code 1, and so on, so a part is planned once, after all of its parents.

A worked example: one window, three printouts

This example is invented; it is not a customer record. The Cascade 440 is a window with a fixed lite and an opening vent sash. The vent sash is built ahead and stocked. It is also used in a twin model, the Cascade 440T. The hardware kit is a phantom. Engineering groups hinges, handle, and screws under it, but nobody builds or stocks it as a separate item. The same low-E insulating glass unit (IGU) goes into the fixed lite and the sash. Hinges, handle, gaskets, and sealant are left out to keep the example small.

invented example · Cascade 440 windowsinglebom.json
{
  "id": "bom.win.cw-440",
  "nodes": [
    { "id": "CW-440",  "name": "Cascade 440 window",  "sold": true },
    { "id": "FRM-440", "name": "frame assembly",      "make": true },
    { "id": "VNT-440", "name": "vent sash assembly",  "make": true, "stocked": true },
    { "id": "HK-440",  "name": "hardware kit",        "phantom": true },
    { "id": "IGU-LE2", "name": "IGU, low-E double",   "buy": true },
    { "id": "EXT-F",   "name": "frame extrusion",     "buy": true, "uom": "m" },
    { "id": "SCR-8",   "name": "screw, #8 x 1 in",    "buy": true }
  ],
  "edges": [
    { "from": "CW-440",  "to": "FRM-440", "qty": 1 },
    { "from": "CW-440",  "to": "VNT-440", "qty": 1 },
    { "from": "CW-440",  "to": "IGU-LE2", "qty": 1, "role": "fixed lite" },
    { "from": "FRM-440", "to": "EXT-F",   "qty": 7.0, "scrap": 0.03 },
    { "from": "FRM-440", "to": "SCR-8",   "qty": 8 },
    { "from": "VNT-440", "to": "IGU-LE2", "qty": 1, "role": "vent lite" },
    { "from": "VNT-440", "to": "HK-440",  "qty": 1 },
    { "from": "HK-440",  "to": "SCR-8",   "qty": 6 }
  ]
}

Invented example, not a customer record. Seven items, eight links. There are no level numbers in the file. Levels, totals, and low-level codes are all computed from the edges. Scrap sits on the edge where the loss happens.

The same eight edges, printed three ways for one window, plus the netted quantity for an order of 20 windows with 6 vent sashes already on the shelf and nothing else in stock:

ItemIndented (level: qty per parent)Summarized, per windowLow-level code20 windows, summarized × 2020 windows, netted level by level
FRM-440 frame1: 1112020
VNT-440 vent sash1: 1112014 to build (6 in stock)
HK-440 hardware kit2: 1 (phantom)hidden or 1, depending on the report220none: no order for a phantom; its contents go on the sash work order
IGU-LE2 glass unit1: 1 (fixed lite), 2: 1 (in the sash)224034 (20 fixed + 14 for new sashes)
EXT-F extrusion2: 7.0 m + 3% scrap7.21 m2144.2 m144.2 m
SCR-8 screw2: 8 (frame), 3: 6 (kit in the sash)143280244 (160 frame + 84 for new sashes)

The summarized column is correct, and it is what costing wants. It is still the wrong list to buy from. The six sashes on the shelf already contain their glass and their screws, so a buyer working from summarized totals orders 6 extra custom-size IGUs and 36 extra screws. The screws do not matter. The glass is cut to size, and you are not sending it back. MRP gets it right because it nets each level against stock before it explodes the level below.SAP Business One's MRP guidedescribes it as carrying net parent demand down the structure.

Where scrap is stored changes the numbers too. The 3% on the extrusion is component scrap: it raises one line. SAP's training separates that fromassembly scrap, which is kept on the assembly's material master and raises the order quantity of the assembly and of every component under it. A spreadsheet with one scrap column cannot hold both, so one of them is usually missing from the roll-up.

Which level each document reads

The structure is the same for everyone. What differs is which slice of it each reader uses, and that is where copies split off.

ReaderWhat it takes from the structureWhere a copy drifts
Quote (CPQ)Level 0: CW-440 with the chosen options, and a cost roll-up behind the priceIf the cost model uses 7.0 m of extrusion and the MBOM uses 7.21 m, quoted material cost is 3% light on that line
EBOM reviewFull indented tree, including the HK-440 groupingAn exported tree with two VNT-440 blocks (one under CW-440, one under CW-440T) gets edited in one place only
MBOM and MRPNetted by low-level code, phantom passed through, stock on VNT-440 countedIf HK-440 is set up as a stocked item, MRP plans orders for a kit nobody builds
Work order for VNT-440One level: IGU-LE2 ×1 and the kit's 6 screws, pulled up from the phantomA traveler printed from the EBOM lists "HK-440 ×1", and the line goes looking for a kit that does not exist
InvoiceLevel 0: one CW-440 line at the quoted priceRebuilt from a flat CPQ output, the invoice lists components the customer never bought separately
Where-used, before a changeWalks up the edges: IGU-LE2 → VNT-440 → CW-440 and CW-440T, and IGU-LE2 → CW-440 directlyA search of one product's spreadsheet finds the fixed lite and the sash in CW-440, and misses CW-440T

The phantom behaviour in the table matches how SAP describes it: aphantom assembly is a logical groupingwhose components go straight into the assembly above it. Infor LN'smultilevel BOM examplemarks a manufactured wheel as a phantom in the same way.

Why the Excel version breaks

Spreadsheet BOMs encode the structure in one of three ways, and only one survives normal editing.

  • A level column. The parent of each row is the nearest row above it with a lower level. The structure lives in the row order, so sort by part number once and it is gone. In oner/excel thread about a 12,000-line indented BOM, one reply warned that the layout breaks as soon as a component is used in more than one assembly, and asked whether the sheet had parent and child columns.
  • Outline numbers such as 3, 3.1, 3.2.1, the form an indented SOLIDWORKS export takes with detailed numbering. Insert a part and the numbers below it shift. Hand edits leave gaps and repeats that no formula can parse.
  • Parent and child on every row. One row per link. Sorting, filtering, and inserting rows do not change the structure. This is the shape MRPeasy asks for on import, and the only one of the three that matches what the ERP stores.

A quick test for any BOM file you are handed: sort it by part number, then try to rebuild the tree. If you cannot, the file stores its structure in row order, and every copy of it is a fork waiting to happen.

Checklist: keeping a multi-level BOM one structure

  1. Store links, not levels. Parent, child, quantity per parent, unit, scrap. Compute levels and indentation from them.
  2. One definition per subassembly. If its contents appear in two files, one file is the owner and the other gets regenerated.
  3. Decide each level on purpose. If you stock it, schedule it, or cost it, it is an assembly. If not, flag it as a phantom.
  4. Recalculate low-level codes after structure changes. Most ERPs do it during BOM maintenance. Some need a batch job before the MRP run.
  5. Never buy from a summarized BOM when subassemblies are stocked. Net level by level, or let MRP do it.
  6. Store scrap where it happens: on the link for component loss, on the assembly for assembly loss.
  7. Run where-used across all products before any change, not inside one product's file.
  8. Write down which level each commercial document reads. The quote and the invoice should name the same level-0 item, and the quote's cost should come from the same edges as the MBOM's.

Where SingleBOM fits, and where it doesn't

When your BOMs live in one ERP, the plant plans from it, and you quote and invoice standard level-0 items from the same item master, you already have one structure. Keep it clean with the checklist above. You do not need another system.

SingleBOM is for the case where the structure gets copied: CPQ holds its own cost roll-up, engineering exports indented BOMs to suppliers, and billing has its own item list. In SingleBOM the product is one graph-style JSON record of nodes and edges, like the snippet above. Sales quotes from that record, engineering and the plant read their BOMs from it, and so do the work order and the invoice. The shared sash is defined once however many products use it, and the quote's cost and the MBOM come from the same edges.

It does not run MRP. Netting, lot sizing, and low-level-code planning stay in your ERP, which already does them well. It does not replace your CAD structure either. And it adds an integration of its own, which is worth it only if keeping the copies in step costs you more.

Related: for how engineering and the plant arrange one product differently, see EBOM vs MBOM. For products whose structure changes with options, see What is a 150% BOM?For how the sold structure and the built structure overlap, see Sales BOM vs production BOM. For routing a change through every system that holds the structure, see ECOs across CPQ, PLM and ERP. To check whether one product has already drifted, see CPQ BOM reconciliation.